 A Memorandum of Understanding was signed by ACECR Sharif Branch and Industrial Development and Renovation Organization of Iran (IDRO) in October 8, 2011 for implementing the “Connected Vehicles Technology” project.

 
 The project contract “Connected Vehicles Technology” was signed by ACECR Sharif Branch and Industrial Development and Renovation Organization of Iran (IDRO) in November 12, 2011.

 
 The Official Start of the Project Contract in December 17, 2011.

 
 Announcing the general approach of the Telecommunication Regulatory Authority to welcome and support for the Connected Vehicles Technology project and implementing the project pilot

 
 Field Test of Application No.6 Report of the Results (Informing the status of the road in terms of meteorological phenomena)

 
 Field Test of Application No. 7 Report of the Results (Emergency Electronic Brake Lights Warning)

 
 Field Test of Application No. 8 Report of the Results (Emergency Vehicle Warning to the Surrounding Vehicles)

 
 Issuing the Temporary License of Utilizing the 802.11p Frequency Band for the CVT Pilot Project

 
 A report on performance of VMS updating application using connected vehicle technology based on DSRC protocol

Download :  JD CVT VMSUpdating App Test Report No01 r1
 Installation and Test of the 4th RSU along the Project Implementation Route (Nazarabad in Karaj-Qazvin highway)

Download :  Installation and Test Report of the 4th RSU along the Project Implementation Route
 Installation and Test of the 5th RSU along the Project Implementation Route (at the beginning of Qazvin-Zanjan freeway)

Download :  Installation and Test Report of the 5th RSU along the Project Implementation Route
 Installation and Test of the 7th RSU along the Project Implementation Route (at the beginning of Karaj-Qazvin freeway)

Download :  Installation and Test Report of the 7th RSU along the Project Implementation Route
 Installation and Test of the 8th RSU along the Project Implementation Route (Qazvin-Rasht freeway Emamzade Hashem toll collection station)

Download :  Installation and Test Report of the 8th RSU along the Project Implementation Route
 Installation and Test of the 9th RSU along the Project Implementation Route (Qazvin Toll Collection Station, Qazvin-Rasht Freeway)

Download :  Installation and Test Report of the 9th RSU along the Project Implementation Route
 Installation and Test of the 10th RSU along the Project Implementation Route (Qazvin-Rasht freeway, Kouhin pass Road Maintenance Division)

Download :  Installation and Test Report of the Tenth RSU along the Project Implementation Route
 Installation and Test of the 11th RSU along the Project Implementation Route (Karaj-Qazvin freeway, Industrial city of Caspian)

Download :  Installation and Test Report of the 11th RSU along the Project Implementation Route